Scheduling Projects List
Event Center - Sevierville, TN
• Contract value: $10.4 m
• Owner: City of Sevierville, TN
• Site and Road Excavation, Drainage, Water and Sewer
Upgrades, Telecommunications Installation, Paving
Greene County, TN
• Contract value: $6 m
• Owner: TDOT
• Road Excavation, River Bridge (800 ft total span),
Drainage, Water line installation, Paving, Retaining
Walls, Asphalt Paving
Cocke County, TN
• Contract Value: $ 11.2 m
• Owner: TDOT
• Mass Grading , Drainage, Paving, Retaining Walls, Box
Culverts
SmartFIX Contract 1 (Knox County)
• Contract Value: $86 m
• Owner: TDOT
• Grading, Drainage, Water, Sewer, Telecommunications,
ITS, Concrete and Steel Bridges, Retaining Walls,
Asphalt and Concrete Paving
SmartFIX Contract 2 (Knox County)
• Contract Value: $105 m
• Owner: TDOT
• Grading, Drainage, Water, Sewer, Telecommunications,
ITS, Concrete and Steel Bridges, Retaining Walls,
Asphalt and Concrete Paving
SmartFIX Contract 3 (Knox County)
• Contract Value: $19.9 m
• Owner: TDOT
• Grading, Drainage, Water, Sewer, Telecommunications,
Retaining Walls, Asphalt and Concrete Paving
Foothills Parkway Bridge #8
• Contract Value: $4.7 m
• Owner: FHWA Eastern Federal Lands Division
• Grading, Drainage, Concrete Bridge (240 ft total
span), Retaining Walls, Asphalt Paving, in a remote
mountainous setting.
Buncombe County, NC Design Build
• Contract Value: $54.2 m
• Owner:
NCDOT
• Grading, Drainage, Water, Sewer,
Telecommunications, ITS, Concrete and Steel Bridges,
Retaining Walls, Asphalt and Concrete Paving
SR 840
Williamson County, TN
• Contract Value: $44.6 m
• Owner:
TDOT
• Grading, Drainage, Concrete Bridges, and
Retaining Walls
Spur
Rehabilitation Sevier County, TN
• Contract Value: $7.6 m
• Owner:
FHWA Eastern Federal Lands Division
• Slide
Repair, Tunnel Repair, Paving, and Ultra-Thin Asphalt
Overlay
SR 29
Rhea County, TN
• Contract Value: $9.6 m
• Owner:
TDOT
• Grading, Drainage, Concrete Bridges,
Channel Relocation, and a Retaining Wall
Claims Project List
Wyeth Pharmaceuticals v. BWSC et al
• Major building modifications from unforeseen
subsurface conditions
• Owner: Wyeth Pharmaceuticals
• General Contractor: Skanska USA Building, Inc.
• Engineer of record: Barge, Waggoner, Sumner, and
Cannon
• Geotechnical Engineer: Law Engineering
• CEC involvement:
Kellogg, Brown & Root v. NCDOT
• Time delays and cost overruns resulting from erroneous
engineering data on contract documents
• Quantity dispute
• Owner: North Carolina DOT
• General Contractor: Kellogg, Brown & Root
• Engineer of record: NCDOT
• CEC involvement:
-
Given
available spoil pits, determined average haul
distances and increased haul costs from daily diary
information
-
Developed reliable method for determining actual
quantities of mass excavation based on revised
aerial photography, final cross-section data and
truck counts.